Introduction
The Production Planner feature in the Digital Kitchen Management module streamlines kitchen operations by offering tailored production plans for selected products throughout the day.
Generated automatically, these plans are crafted based on historical sales data. The quantities for each product within the plan are calculated using the average sale quantity on the corresponding day of the week in recent weeks. For instance, values in Friday's plan are derived from the sales data of recent Fridays.
Flexibility is a key element. Production quantities can be edited up to 7 days in advance, either by adjusting individual product requirements or by modifying predicted sales for a specific date.
Upon approval, the plan is ready for printing. The system adheres to the Production Plan Configuration of each site, ensuring seamless and customised planning.
A production plan may include various sections, each containing selected products assigned to a specific product family. It can be further organised into different timeslots based on the selected planner period, and the display can be customised as either a list or a table.
Production Plan States
Information on each of the states that production plans flow through:
- Pending: The production has been created with default values and can be reviewed.
- Editing: Production plan values within the plan can be edited if required.
- Approved: The production plan been approved and can be printed if required.
- Completed: The date of the production plan has passed and the plan is archived as completed.
Production Plan Reporting
There are no production plan reports currently.
Production Plan Articles
For information on using Production Plans, see:
Comments
0 comments
Article is closed for comments.