Introduction
The process of undoing a product preparation depends on the state currently in:
- Product preparations in Made state can be rolled back to Scheduled state.
- Product preparations in Scheduled state can be rolled back to Preparation state.
Rolling Back A Made Product Preparation
Product preparations in Made state can be rolled back to Scheduled state to make changes if required.
You can only roll back a Made product preparation if:
- You have rights to do so. (Click Here if you do not have rights to roll back but believe you should.)
- The product preparation is in an open period, if periods are used.
To roll back a Made product preparation:
- Head to Inventory Management > Product Preparations.
- Locate the required product preparation and select [EDIT].
Within the product preparation:
- Select [UNDO MAKE].
- Confirm the roll back.
The product preparation is now back in Scheduled state.
Rolling Back A Scheduled Product Preparation
Product preparations in Scheduled state can be rolled back to Preparation state to make changes if required. As the product preparation has not yet been made, additional roll back rights are not required.
To roll back a Scheduled product preparation:
- Head to Inventory Management > Product Preparations.
- Locate the required product preparation and select [EDIT].
Within the product preparation:
- Select [UNDO SCHEDULE].
- Confirm the roll back.
The product preparation is now back in Preparation state.